Glacial Ridge Field Site

UND Atmospheric Science Glacial Ridge field site documentation exists as one large collection, fully searchable using the “Search” box on the left-hand side of the page. Indexes of documentation related to instruments at the field site and data handling processes are given below.

Documentation related to instruments and data at the department's field site http://glacialridge.atmos.und.edu/.

The site phone number is 218 637-2346.

Rain gauge data around Glacialridge is available from the USGS

UPDATE

Pesticide Sampling is now conducted on the roof of Clifford Hall as of Summer 2018. All recorded data after that date will be from the roof measurements.

As of 06/06/2019 a seasonal passive pesticide sampler has been placed at the Glacial Ridge Site.

Field Site Instrumentation Blog

Check here to see any issues with the computers/data collection at the field site:

Site Visits

Current Field Site Instruments

Former Field Site Instruments

Data Logger/Loggernet Software

Software

  • PC400 - Cannot be used for web interface purposes since software does not enable scheduled data collection (which is required to run projects with RTMC.
  • RTMC/RTMC Pro- software allows you to build projects which visualize realtime data. Projects can then be run via web server and displayed online.
  • LoggerNet 2.1- currently outdated
  • LoggerNet 4.2- latest version. Allows scheduled data collection. Includes RTMC PRO, may or may not include web server.

* Note: Connecting to datalogger will not be possible if Loggernet or PC400 software is running on other platforms i.e. glaceridge1 .

Pesticide Sampler Instrument Checklist

1)Put on gloves
2)Use log book, note time, day, etc... and take readings from both gauges on Pesticide sampler.
3)Turn off motor
4)Put up top lid of whole Pesticide instrument
5)Put the top of the inside sample head (which is found next to sample head) back on, when screwing the top on keep screws loose (DO NOT over tighten!!)(Be aware the outside of the sampler top is also facing down to keep inside lid clean)
6)Pull bottom hinges up when removing the sample head.
7)Replace with the new sample head (have hinges up when putting in new sample head and then put hinges back down)
8)Loosen screws to the top of the sample head and place top clean side up next to the head.
9)Put instrument top back down
9)Start motor to instrument
10)Record same readings
11)Replace again in two weeks