Nicole Bart and David Delene went out to Glacial Ridge site during late morning and changed the filter on the pesticide sampler on September 16, 2012.

The profiler computer was awaiting for the network connection from Glacial Ridge 1. Must of been a power outage. The Glacial Ridge 1 computer was removed from the UPS. The network box was put on the Profile's UPS.

A Paths through the weeds was made. Need some more work. Need a better weed cutter.

Turned off the A/C unit since the weather shouldn't be that warm.