User Tools

Site Tools


atmos:glacialridge:september_23_2013
  • Phondie Simelane
  • Purpose: Change sample heads, check on computers and take pictures of new antenna
Summary
  • F Drive: 40 % full
  • G Drive: 13 % full
  • Temp: 80, AC still on. Heaters were turned on last week (but are not yet generating heat).
  • ND-1-029 in place, magnetic helic reading was initially high when motor was restarted (~50). After waiting a few minutes the setting was reduced down to 44.
  • 1 more sample head left
  • Removed large box from trailer
Next Visit
  • Shut down pesticide sampler
  • Return with Dr. Raina's samples
  • Bring up light bulbs
  • Possibly bring in new Glacial Ridge computer
  • Prep site for winter (turn off AC)
atmos/glacialridge/september_23_2013.txt · Last modified: 2020/01/29 17:25 by 127.0.0.1