atmos:glacialridge:september_23_2013
- Phondie Simelane
- Purpose: Change sample heads, check on computers and take pictures of new antenna
Summary
- F Drive: 40 % full
- G Drive: 13 % full
- Temp: 80, AC still on. Heaters were turned on last week (but are not yet generating heat).
- ND-1-029 in place, magnetic helic reading was initially high when motor was restarted (~50). After waiting a few minutes the setting was reduced down to 44.
- 1 more sample head left
- Removed large box from trailer
Next Visit
- Shut down pesticide sampler
- Return with Dr. Raina's samples
- Bring up light bulbs
- Possibly bring in new Glacial Ridge computer
- Prep site for winter (turn off AC)