User Tools

Site Tools


atmos:glacialridge:october_23_2008

October 23, 2008

  • Replaced 2 batteries in the UPS connected to GLACIALRIDGE2
  • Turned on the three space heaters
  • Re-started the NOAA profiler PC (per Dave Carter's instructions)
  • Brought in rain gauge
  • Re-positioned snow board for sonic snow depth sensor
  • Collected three solar panels belonging to Duke University at remote USGS sites
  • Attempted to diagnose surface met. station issues, appears to be a network interface problem
atmos/glacialridge/october_23_2008.txt · Last modified: 2020/01/29 17:25 by 127.0.0.1