User Tools

Site Tools


atmos:glacialridge:october_11_2012

The 2012 Measurement System's class visited the site, along with Ph.D. student Tim and Dr. Renata Raina.

The profiler computer was awaiting for the network connection from Glacial Ridge 1. It was reset.

Dr. Raina's pesticide monitor was shutdown for the winter.

The rain gauge was removed for the winter.

Data from the weather station was archived.

The trailer A/C unit was disconnected and the heaters turned on.

atmos/glacialridge/october_11_2012.txt · Last modified: 2020/01/29 17:25 by 127.0.0.1