User Tools

Site Tools


atmos:glacialridge:august_28_2008

August 28, 2008

  • Removed F:/ from GLACIALRIDGE2 for archiving at UND
  • Adjusted air-conditioner to 72 F
  • Re-started NOAA profiler computer
  • Attempted to use power supply for A/C unit, however after about 30 seconds it would beep indicating an overload and we had to take the A/C off the UPS.
  • Attempted to replace battery in UPS for GLACIALRIDGE2, but there are 2 required batteries and we only had 1.
  • Connected UPS to GLACIALRIDGE2 so we can use the UPSMON software on GLACIALRIDGE2 to monitor the UPS.
atmos/glacialridge/august_28_2008.txt · Last modified: 2020/01/29 17:25 by 127.0.0.1