User Tools

Site Tools


atmos:citation:field:saudi:spring_2009

Kingdom of Saudi Arabia Spring 2009

  • Start date: March 15 th, 2009
  • End Date: April 15 th, 2009
  • Aircraft: King Air N825ST

Images and quick look plots related to the Spring 2009 Saudi Project are on the project's album site.

Flight Summary

Flight Date Start UTC Stop UTC Total Flight Purpose Instruments Status
YYYY/MM/DD HH:MM:SS HH:MM:SS Hours Type of Research PCASP, FSSP, 2-DC, AIMMS, CCNC, CPC
2009/03/17 13:13:42 14:16:29 1.05 Instrument Check Out PCASP, FSSP, 2-DC, AIMMS
2009/03/18 7:55:33 11:10:38 3.25 Cloud Sampling PCASP, FSSP, 2-DC, AIMMS
2009/03/19 11:08:16 13:04:44 1.92 AIMMS Calibration PCASP, FSSP, 2-DC, AIMMS, CCNC*
2009/03/20 6:46:51 9:07:54 2.35 Cloud Sampling PCASP, FSSP, 2-DC, AIMMS, CCNC*
2009/03/21 12:36:04 15:03:54 2.46 AIMMS/Hot Wire Calibration PCASP, FSSP, 2-DC, AIMMS, CCNC*
2009/03/23 11:44:54 14:13:25 2.48 AIMMS Calibration PCASP, FSSP, 2-DC, AIMMS, CCNC
2009/03/26 6:39:42 8:50:20 2.18 Cloud Sampling PCASP, FSSP, 2-DC, AIMMS, CCNC, CPC*
2009/03/26 11:36:15 13:52:41 2.27 Cloud Sampling PCASP, FSSP, 2-DC, AIMMS, CCNC, CPC*
2009/03/28 11:48:21 14:02:47 2.24 Cloud Sampling PCASP, FSSP, 2-DC, AIMMS, CCNC, CPC*
2009/03/31 12:26:17 13:36:00 1.16 Engine Exhaust and Inlets PCASP, FSSP, 2-DC, AIMMS, CCNC, CPC
2009/04/02 13:10:20 15:43:10 2.55 Cloud Sampling PCASP, FSSP, 2-DC, AIMMS, CCNC, CPC
2009/04/06 8:13:19 10:38:06 2.41 Khamis Cloud Sampling PCASP, FSSP, 2-DC, AIMMS, CCNC, CPC
2009/04/06 13:01:09 15:55:16 2.90 Khamis Cloud Sampling PCASP, FSSP, 2-DC, AIMMS, CCNC, CPC
2009/04/08 12:30:26 14:51:19 2.35 Cloud Sampling PCASP, FSSP, 2-DC, AIMMS, CCNC, CPC
2009/04/09 12:32:25 14:28:18 1.93 Cloud Sampling PCASP, FSSP, 2-DC, AIMMS, CCNC, CPC
2009/04/12 11:57:13 15:09:04 3.20 Cloud Sampling PCASP, 2-DC, AIMMS, CCNC, CPC
Total Flights Average Start Average End Total Hours Flight Purpose Instruments Status Summary
16 11:05:03 13:22:45 36.70 11 Cloud Sampling PCASP, FSSP, 2-DC, AIMMS, CCNC, CPC

Project generated 36 files of ground test data and had 34 training activities involving Saudi Arabia personnel.
* Denotes instrument was not functioning properly

Project Documents

Instrument Information and Calibration: saudi2009_kingair_instruments_090325.doc

Summary of cloud penetrations: saudi_09_cloud_1.xls : Updated 06_16_09 @ 12:20

Video notes (Gökhan Sever)

Analysis Notes:

March 18 (Poellot): analysis_notes_mp_031809.doc

March 26 1st flight (Poellot): analysis_notes_march_26_1st_poellot.doc

March 26 2nd flight (Poellot): analysis_notes_march_26_2nd_poellot.doc

March 28 (Poellot) analysis_notes_march_28_poellot_.doc

April 2 (Poellot) analysis_notes_april_2_poellot.doc

April 6 1st flight (Poellot) analysis_notes_mp_040609a.doc

April 6 2nd flight (Poellot):analysis_notes_mp_040609b.doc

April 8 (Poellot) analysis_notes_mp_040809.doc

Cloud analysis (Gökhan Sever)

Ascend and Descend Flight Times

atmos/citation/field/saudi/spring_2009.txt · Last modified: 2020/01/29 17:25 by 127.0.0.1