atmos:citation:field:impacts2021:home
Table of Contents
NASA IMPACTS 2022
- Project: IMPACTS - Investigation of Microphysics and Precipitation for Atlantic Coast-Threatening Snowstorms
- Dates: January and February 2022
- Location: North East (United States)
- Platform: NASA P3
- Tail Number: N426NA
- Flight Level Processing Script: process_all_impacts
Links
Processing
Analysis
Documentation
- 2020 Field Campaign: IMPACTS 2020
Note: The files below may be updated or added to frequently. Please view the most recent version on the UND “Aircraft” server in the locations listed.
- Aircraft Configuration Document: /nas/und/NorthEast/2022/Aircraft/P3_N426NA/Documents/Configurations
- Probe Operator Checklists: /nas/und/NorthEast/2022/Aircraft/P3_N426NA/Documents/Checklists
- Probe Maintenance Checklists: /nas/und/NorthEast/2022/Aircraft/P3_N426NA/Documents/Checklists
- M300 Tables: /nas/und/NorthEast/2022/Aircraft/P3_N426NA/Documents/M300_Table_Archive
- Ground Test Data: /nas/und/NorthEast/2022/Aircraft/P3_N426NA/GroundData
- Flight Data: /nas/und/NorthEast/2022/Aircraft/P3_N426NA/FlightData
Items to Bring for January 2022
- Probe Covers (HVPS, CDP, King, etc).
- IPAD and holders
- Cable Ties
- Spare Network cables
- Spare USB to Network adapters
- Spare label maker tape
- USB sticks for instruments
Items and Issues to Address Post-field Project
- Set the HVPS3-B computer to not boot on power on. Have to remove cover and set jumper switch.
- See about getting old M300 system booted or updated with new system.
- Holder for in front of 2DS for mist generator.
2022/01/11 Flight Items
- 2DS Can Low Pressure
- Issue - The 2DS pressure went < 9 psi; while the HVPS3 pressures remained high.
- Cause - Like cause is a bad o-ring or seal on Can. Will remove probe and check o-ring.
- Downlinking Data
- Issue - On NASA system not getting down link packages from the M300. Will ground trouble shoot.
- Hawkeye TimeSync
- Issue - Have to manually set the time on the Hawkeye computer.
- Cause - Works on other computers and can ping the NTP server. Will ground trouble shoot.
- Fix - Needed to adjust the Time server IP address in the 'NTP Time Server Monitor (the application is on the desktop). Had to click on the NTP Configuration File tab and scrolled down to replace the old time server IP address. Next, we had to run the 'SPEC NTP Sync' application (also located on the desktop) which allowed the time to sync up with the P-3. Now the time should sync up with the aircraft upon boot-up.
- M300 WCM Data
- Issue - Need to adjust M300 configuration so Data status window correctly displays getting WCM data.
2022/01/17 Flight Items
- HVPS-3A Connection issue
- Issue - Software was not able to connect the the probe. Was able to ping the probe through the software and through a command prompt. Still no data.
- Cause -
- Fix -
Getting Ready for 2023 Deployment
Items to Buy
Status of Items Purchased
Item | Date Item was Ordered | Date Item was Received | Date Item was Installed | Items Current Location (Date) |
UPS | 7/8/22 | 7/15/22 | Clifford Hall Lab | |
Cleaning Swabs | 7/8/22 |
Things to Be Addressed
atmos/citation/field/impacts2021/home.txt · Last modified: 2023/11/04 06:32 by 127.0.0.1