Replaced 2 batteries in the UPS connected to GLACIALRIDGE2
Turned on the three space heaters
Re-started the NOAA profiler PC (per Dave Carter's instructions)
Brought in rain gauge
Re-positioned snow board for sonic snow depth sensor
Collected three solar panels belonging to Duke University at remote USGS sites
Attempted to diagnose surface met. station issues, appears to be a network interface problem