Andrea Neumann and David Delene went out to Glacial Ridge site during late afternoon and changed the filter on the pesticide sampler on August 30, 2012.
The profiler computer was awaiting for the network connection from Glacial Ridge 1. Must of been a power outage. The UPS for Glacial Ridge 1 is not keeping the computer running. Need to think about replacing it.
The weeds at the site were high. Hopefully, paths to each of the instruments can be made at least.