Fix the Cloud Droplet Probe probe wiring so the M300 gets data.
Check the Cloud Droplet Probe with 15 and 30 um beads.
Install new chips in the CPI serial data card. Check to see if probe works.
New chips were installed but did not fix the problem. Will try switching out the board.
Fill the CPC with alcohol.
Before Field Project
Hardware (Aaron, Kirk, etc.)
Switch the seat belt in Observer seat to a longer one from one of the spare seats.
Check the power budget. On April 13 flight, AC Inverter 3 was drawing > 9.5 amps while Inverter 4 was only drawing 2 amps. Maybe we should move either the 2-DC or CIP to Inverter 4 from Inverter 3.
The CPC flow rate on the A/D board is backwards (negative). Switch the wires around and check that the voltage is positive when the CPC is on.
Install extension tube for CPC fill tube.
The TDL 2F A/D reading doesn't seem correct. Either the wire is connected backwards or not connected at all.
Fix the labels on the back rack.
M300 Computer (David)
Fix the automatic naming of file in the M300 so to match the UND standard.
Allow the timesync.awk to run as bypass user.
M300 Tables, Calibrations, and Check List (Andrea)
Change check list to indicate that m300 software should be started with the 'go' command.
Determine Honeywell Wing Transducer calibration, and update Wiki page and software with calibration value.
Update the M300 Table so that the CPC mass flow rate is taken from the Mass Flow Meter.
Add convection of the Mass Flow rate to a volumetric flow rate. Use volumetric flow rate to calculate CPC concentration.
Add real time wind calibration to M300 table.
Hardware - Long Term
Have figured out the type of character generator, camera and DVR to get.
Task: Purchase and Install forward looking Video Camera.