Date | Location | Notes/Reason for Relocation |
June 05, 2012 | Installed computer in rack #1 | Ground tested with wire. All channels has shadows. Droplet sprctrum was normal with water spray test. House keeping data looked good. |
June 05, 2012 | Installed HVPS3 probe in Left Pylon, outboard PMS can. | The network connection to probe was 100mb, and not 10mb like previously. |
May 30, 2012 | Received from SPEC inc. | Received both HVPS probe and computer with manual. |
March 22, 2012 | Shipped back to SPEC inc. | Used SPEC's HVPS for GCPEX and need to return. SPEC will send us our new probe shorly. |