11/24/2020: Wind Vane is misaligned, data is inaccurate. Instrument removal needed to fix
12/18/2020: Reset power
01/08/2021: Wind vane fixed but needs re calibration. Pi tube was blown off, may need glued on if issue recurs
03/15/2021: Station removed from roof of Clifford Hall
05/09/2021: Testing and debugging. Pi currently running SD card labeled 3D-PAWS ver. 20210302. All instruments sending data sans Wind Vane.
02/15/2022: System updated and debugged. Currently in the process of repackaging and testing waterproofing measures. All instruments functioning but needs calibration.
10/23/2022: Removed from roof. Inconstant and poor data is being recorded. currently inspecting for loose wires and replacing as needed. So far radiation shield and tipping bucket have been inspected. Tipping bucket has been replaced.
10/31/2022: Reset on roof, All instruments are functional.
11/15/2022: Removed precipitation sensor. Capped for the season.