atmos:data_skills_pathway:workspace:projects
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| atmos:data_skills_pathway:workspace:projects [2026/01/20 02:37] – [Mentor + Available Projects] marwa | atmos:data_skills_pathway:workspace:projects [2026/02/12 20:19] (current) – delene | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ====== Data Skills Pathway | + | ====== Data Skills Pathway |
| - | This page lists mentor-offered project options for students. Projects may use instrument datasets, model output, and/or dashboards. Students | + | Below is a list of mentored projects involving undergraduate |
| - | ===== Mentor + Available Projects | + | ===== Research Project Overview |
| - | ^ Project | + | ^ Project |
| - | | (1) Field airborne dataset analysis | + | | Aircraft Probe Fuid Flow Analysis| David Delene | Davyd | Fall 2024 | Reproducing Figures |
| - | |(1) Camera/ | + | | Fog Monitor Build/ |
| - | Dr. Marwa Majdi | marwa.majdi@und.edu | + | | Camera/ |
| + | | Airport Lead Filter Collection | ||
| + | | Chain Aggregates Statistic | ||
| + | | UND Fleet Leaded Fuel Analysis | ||
| + | | HVPS Sampling Collection/Analysis| David Delene | Bryce, Conrad | Fall 2025 | Analyze 12/18 Data | ||
| + | | TIMMS SN00400 Build/ | ||
| + | | CH601 Radar Upgrade | ||
| + | | CH601 Windsonic Anemometer | ||
| + | | UPS/Data for Filter Sampler | ||
| + | | 2DS Electric Field Build/ | ||
| + | | Electric Field Calibration System| Daile Zhang | | Spring | ||
| + | | Additional Electric Field Obs. | Daile Zhang | | Spring | ||
| + | | Grafana Displays | ||
| + | | Model Output Sampling/ | ||
| + | | Fog climatology / Forecasting | ||
| + | | Airborne Pylon Shattering Effects| Shawn Wagner | | Winter 2025 | IMPACTS Data Analysis | | ||
| + | | T-28 Time-series Analysis | ||
| + | | Weather Modification | ||
| - | ===== Notes ===== | + | ===== Project Links ===== |
| - | | + | * [[https:// |
| - | * ** Project Scope must be confirmed by Week 3.** After meeting with the mentor, each student must confirm their final project scope by the end of Week 3. | + | * [[https:// |
| + | | ||
| - | ---- | + | ===== Internship / Job Links ===== |
| + | * [[ https:// | ||
| [[atmos: | [[atmos: | ||
atmos/data_skills_pathway/workspace/projects.1768876653.txt.gz · Last modified: 2026/01/20 02:37 by marwa