atmos:data_skills_pathway:workspace:projects
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| atmos:data_skills_pathway:workspace:projects [2026/01/12 21:17] – [Notes] marwa | atmos:data_skills_pathway:workspace:projects [2026/01/12 21:17] (current) – [Notes] marwa | ||
|---|---|---|---|
| Line 9: | Line 9: | ||
| ===== Notes ===== | ===== Notes ===== | ||
| * **Project offerings may change each semester.** Mentors may add, remove, or revise projects based on available datasets, ongoing research needs, and student skill levels. | * **Project offerings may change each semester.** Mentors may add, remove, or revise projects based on available datasets, ongoing research needs, and student skill levels. | ||
| - | * **Scope must be confirmed by Week 3.** After meeting with the mentor, each student must confirm their final project scope by the end of Week 3. | + | * ** Project |
| ---- | ---- | ||
atmos/data_skills_pathway/workspace/projects.1768252652.txt.gz · Last modified: 2026/01/12 21:17 by marwa