User Tools

Site Tools


atmos:data_skills_pathway:workspace:projects

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
atmos:data_skills_pathway:workspace:projects [2026/01/12 21:11] – [Data Skills Pathway Projects] marwaatmos:data_skills_pathway:workspace:projects [2026/01/12 21:17] (current) – [Notes] marwa
Line 2: Line 2:
 This page lists mentor-offered project options for students. Projects may use instrument datasets, model output, and/or dashboards. Students should select a project from this list and contact the mentor. This page lists mentor-offered project options for students. Projects may use instrument datasets, model output, and/or dashboards. Students should select a project from this list and contact the mentor.
  
-===== Mentor + projects table =====+===== Mentor + Available Projects  =====
 ^ Mentor Name ^ Email ^ Projects Offered ^ ^ Mentor Name ^ Email ^ Projects Offered ^
-| Dr. David Delene | david.delene@und.edu | (1) Instrument data QA + documentation \\ (2) Field dataset analysis \\ (3) Visualization/dashboard interpretation +| Dr. David Delene | david.delene@und.edu | (1) Field airborne dataset analysis  
-| Dr. Marwa Majdi | marwa.majdi@und.edu | (1) Camera/fog/visibility event analysis \\ (2) Weather data + time-series analysis \\ (3) Model output sampling/validation |+| Dr. Marwa Majdi | marwa.majdi@und.edu | (1) Camera/fog/visibility event analysis  \\ (3) Model output sampling/validation |
  
 ===== Notes ===== ===== Notes =====
-  Mentors may update project offerings each semester. +   **Project offerings may change each semester.** Mentors may add, remove, or revise projects based on available datasets, ongoing research needs, and student skill levels
-  * Students should confirm scope and deliverables with the mentor by Week 3.+  * ** Project Scope must be confirmed by Week 3.** After meeting with the mentor, each student must confirm their final project scope by the end of Week 3.
  
 ---- ----
atmos/data_skills_pathway/workspace/projects.1768252284.txt.gz · Last modified: 2026/01/12 21:11 by marwa